A scan-to-BIM model is only worth what its accuracy is worth. Clients rarely check every wall, but when they find one that is off, they stop trusting the whole model. This article shows a simple scan to BIM quality control routine you can run in Revit before every delivery.

Start with the area you just finished, for example one floor. Crop a 3D view to it with a section box. Face Section Box fits the box around a selected element in one click.

Then run Deviation Check. Every scan point is colored by how far it is from the nearest model surface: green points fit, other colors show where the model and the scan disagree. Points where nothing is modeled stand out too, so you also catch missing elements.
The report lists the elements from worst to best, so you know where to start.

Tips for this step
A list of element IDs is hard to act on. Turn each problem into an issue with a picture. In Model Check, capture the view, draw on it and add a short note.

Link the element to the issue and assign it to the modeler who owns that area. Everyone on the team sees the same list, whether you share it through a team folder or a Google Sheet.
The modeler opens the issue and uses Zoom to element to go straight to the problem.

After the fix, run the deviation check again on that area. With Live on, the points recolor as soon as you move the element, so you see at once whether it now sits on the scan.

Tick the issue Fixed with a short fix note. A second person, the team leader or checker, ticks Verified after looking at it.

Two exports give the client a clear picture:
Keep both with the delivery. If the client questions an area later, you can show what was checked and when.
| Problem | How it shows up |
|---|---|
| Wall on the wrong side of the scan | A whole wall face in one color |
| Wrong wall thickness | One face fits, the other does not |
| Flat floor where the slab sags | Points get worse towards the middle of the room. Shape it with Floor By Points. |
| Missing element | Points with no model surface nearby |
| Column or beam slightly rotated | One end fits, the other drifts away |
Quality control works best as a habit, not a last-minute check. Run it at the end of each floor or each modeling day, and the final check before delivery becomes short. The full process from scan to model is in the scan to BIM workflow, and the Revit-side tools are covered in the Revit point cloud plugin guide. A clean, registered scan from Autodesk ReCap is the starting point: QC can only be as good as the scan you compare with.
How often should I run a deviation check?
At least once per floor or area, and once before delivery. Small checks are faster than one big one at the end.
Does a green model mean the model is correct?
It means the modeled surfaces sit on the scan. You still need to check what the scan cannot show, such as hidden layers, materials and parameters.
Can the client run the check themselves?
Yes, if they have Revit, the point cloud and ZetaBIM. Most clients prefer the exported reports.
ZetaBIM is a Revit plugin for scan-to-BIM teams. See the complete guide to the Revit point cloud plugin workflow. Download ZetaBIM to try it, browse more ZetaBIM tutorials, or watch the videos on the ZetaBIM YouTube channel.